VENTE Annonce
N°492400:
Recherche de client matériels machines Equipment and machines for nuts Industries
wash, sorting, drying, and calibration installation
the lines allows the packaging of nuts after harvest with a flow rate of 3 to 5 tons / hour
the installation incorporates a drying volume of 120 m3, either 40 tons of dried walnuts in each cycle.
a drying cycle is on average 72 hours.
the harvest lasts about 3 weeks, which makes it possible to make 7 drying cycles, or 280 tons of dried walnuts per year.